Hospital – Budrio (BO)
Project Details
Hospital – Budrio (Bologna)
Service: electrical, mechanical and special systems
Years: 2006-2009
Amount of work: € 2.605.951,41
The new branch of Budrio Hospital is a 4 floors (3 above) building for a total of about 5.000m and a Morgue of 300sqm
Each floor is set with two areas and a common area which houses the landing for elevators, stretcher lifts and stairwells.
The building contains 5 RX room, 8 main rooms and 4 ambulatories, 38 hospitalization rooms, 4 emergency rooms and the first aid area and the entrance to the hospital with reception and bar.
Technical rooms are in the basement with the fire-fighting units, with a water sypply of approx 130 cubic meter..
amount of work
FG7OM1 0,6/1 kV
over 1000 points
and 300 full logic emergency light system
UPS for 60kVA
with more than 600 points
for 38 bedrooms, 19 WC, 3 nurse and 17 other rooms
according to EN60849 and BS5839 part B law