Photovoltaic system – Hoffman Italia Spa new headquarter in Vigonza (PD)

Project Details

Photovoltaic system – Hoffman Italia Spa new headquarter in Vigonza (PD)
Services: “Grid-connected” photovoltaic system
Year: 2014-2015
Amount of work: € 133.650,00

In 2015 SICE srl realized a “grid connected” photovoltaic system on the roof of the Hoffmann Group headquarter in Vigonza (PD).
The 99 kWp photovoltaic system installed on the roof has a support structure for the aluminum modules for a total of n. 396 panels 60 cells in polycrystalline silicon Kioto Solar KPV 250 PE PURE 250 Wp/each in fire reaction class 1 connected to n. 3 photovoltaic solar inverters ABB POWER-ONE TRIO 27.6 kW 27.6-TL-OUTD-S2X-400.
The plant produces energy for an amount of approximately 11.,000 kWh/year, so about 1.190 kWh/kWp per year, equivalent to 63 tons of CO2 emissions avoided in the atmosphere each year.

1
euro

amount of work

1
kwh

produced per year

1
kioto solar kpv panels

250 Wp/each reaction fire class 1

1
kwp

total system power

1
inverter